Hillside, Edington
Moore of Devizes Ltd were brought in at an early stage on this project to work alongside Gaiger Bros. and Ashley Design Architects and help with the design process on this project.
With three separate locations: Main house, gym/pool area and store.The brief was to provide space heating, hot water and heated swimming pool, in the three different locations using a central plant room. With not much electrical power available we decided to use a Grant Biomass Boiler to run the three elements.